Load & Feed Tubes
Tubes are loaded into position by the automated system. The feed carriage that then pushes the tube into the crush form station. The tubes are formed at both ends at a rate of 900-1100 an hour, depending on the length of the tube being formed. The tube fall into a automated hopper for shipping.


Comments