Load & Feed Tubes

Tubes are loaded into position by the automated system. The feed carriage that then pushes the tube into the crush form station. The tubes are formed at both ends at a rate of 900-1100 an hour, depending on the length of the tube being formed. The tube fall into a automated hopper for shipping.

 

What did you think of this article?




Trackbacks
  • No trackbacks exist for this post.
Comments
  • No comments exist for this post.
Leave a comment

Submitted comments are subject to moderation before being displayed.

 Enter the above security code (required)

 Name (required)

 Email (will not be published) (required)

 Website

Your comment is 0 characters limited to 3000 characters.